Project Planner: Kinarik Shallow, Associate Planner, City of Roseville, (916) 746-1309 or [emailprotected] Two native oak trees are proposed for removal. Project Address: 3200 Pleasant Grove Bl. Project Applicant: Phil Harvey, Kuchman Architects, (916)447-3436 or [emailprotected] Questions regarding the Fiddyment Plaza project may be directed to Shelby Vockel ([emailprotected]) in the Planning Division at (916) 746-1347. A Design Review Permit is also requested to allow the construction of three modular buildings (50,437 square feet) and open parking areas for RV and boat storage (131,254 square feet), with associated improvements such as lighting and landscaping. Tentative Subdivision Map A second neighborhood association meeting was held on Tuesday March 9th at 7 pm. Project Applicant: David Heumann, K12 Architects, (916) 455-6500 or [emailprotected]K12Architects.com The proposed Mercy Housing project is located on a parcel designated High Density Residential, which was planned for affordable apartments with the adoption of the North Roseville Specific Plan in 1997. Project Planner: Kinarik Shallow, Associate Planner, City of Roseville, (916) 746-1309 or [emailprotected], Project Description: The proposed project is a retail shopping center consisting of an approximate 35,000 square-foot anchor grocery store, a 12-pump gas station with an approximate 3,500 square-foot convenience store and car wash, and seven additional buildings ranging in size from approximately 3,750 square feet to 9,750 square feet. Project Related Documents (as of October 2022): Project Related Documents (as of May 2021): A Modification of a Major Project Permit Stage 1 and Update: The applicant has scheduled a neighborhood meeting for this project on 2/13/23 from 6-7pm at Saint John's Episcopal Church,2351 Pleasant Grove Blvd., Roseville, CA 95747. associated parking for St. Antons Communities and aTentative Subdivision Map to allow the merging and resubdivision of 11 parcels, totaling A total of 30 one bedroom units, 34 two bedroom units, and 34 three bedroom units are proposed, split between the two residential buildings. Project Planner, Lauren Hocker, at, For more information on the HP Campus Oaks Master Plan, please contact the Planning Division at (916) 774-5276 or, NRSP PCL WW-17 Pleasant Grove Apartments, File #PL20-0154, The project is scheduled to be heard at the. Find the resources you need here. he public hearing notice was mailed to property owners within 300 feet of the site, interested persons, posted to the RCONA website, andpublished in the Sacramento Bee. In the case of an emergency shelter, the City has met or exceeded the need for emergency shelter, as identified pursuant to California Government Section 65583(a)(7). Project Description: The applicant requests a Minor Design Review Permit, Tentative Subdivision Map, and Tree Permit to allow construction of18 single-family homes on eighteen residential lots and one common lot. SERSP PCL 81 Johnson Ranch Storage (File# PL18-0355) Costco Wholesale is proposing a 160,529-square-foot warehouse at the northwest corner of Baseline Road and Fiddyment Road. Project Description:The project includes a request for a Specific Plan Amendment, Development Agreement Amendment, and Tentative Parcel Map to subdivide WRSP High Density Residential Parcel F-22 into F-22A and F-22B, and allocate affordable housing units to the parcels. Zoning Ordinance Section 19.74.010 specifies that the Planning Commission is This project site is included in the Citys Housing Element inventory of affordable housing sites and is necessary to comply with the Citys share of regional housing needs. The Westbrook Development Agreement will be amended to reflect the proposed changes. The denial of the housing development project or imposition of conditions is required in order to comply with specific state or federal law, and there is no feasible method to comply without rendering the development unaffordable to low and moderate income households or rendering the development of the emergency shelter financially infeasible. In addition, the Housing Crisis Act of 2019 (SB 330) states that local land use authorities. WEST ROSEVILLE: FUTURE HOUSING DEVELOPMENT LAND USE MAP Jason K. Gallelli Partner - President CA DRE #01143594 [email protected] . Per City code, this project would be required to provide 397 off-street parking spaces. Project Description: Phase 1 of the Campus Oaks Apartments includes a 186-unit High Density Residential (HDR) project with associated clubhouse and pool, on-site parking, and site improvements on Parcel CO-23. comments submitted prior to the hearing. Finally, a Tree Permit is requested to allow the removal of native oak trees. Property Owner:JEN CALIFORNIA 15 LLC Campus Oaks Apartments - Colored Elevations Project Plans Northern Section Notification Of those in attendance, a total of 9individuals and households added contact information to the sign-in sheet for the project. All of the trips have been accounted for in the Citys traffic demand model, and the roadway infrastructure was built to accommodate these trips. Project Description:The proposed project includes construction of a 910-square-foot coffee shop with associated parking and landscaping. August 27, 2020 Planning Commission Agenda, Campus Oaks Apartments The housing development project or emergency shelter is proposed on land zoned for agriculture or resource preservation that is surrounded on at least two sides by land being used for agricultural or resource preservation purposes, or which does not have adequate water or wastewater facilities to serve the project. Plans A total of 414 parking spaces will be provided and 160 of the spaces will be covered with solar carports. (BONA) meeting on August 28, When a Planning Commission decision is appealed, the project Near the corner of Baseline Road and Fiddyment Road, the Denio's family and developer Nick Alexander have done grading work and secured their wetlands permit for Baseline Marketplace, 750,000 square feet of retail space. holding a separate hearing on the appeal, the appeal will be added to the Mitigated Negative Declaration, NCRSP PCL 49 - MPP Stage 1 Mod and Stage 2 (File #PL18-0388) Project Planner: Escarlet Mar, Associate Planner, City of Roseville, (916) 774-5247 or [emailprotected] The proposed project will modify the existing median at the northwest corner of Sun City Bl. Please note that these plans are in draft form and may require additional revisions by City staff and final approvals will be by the Citys Planning Commission and City Council. 110 - ROSEVILLE, CA 95661 Owner: OF PROPERTIES - ATTN: JEFF RONTEN - 2013 OPPORTUNITY DR., STE. This requires the project be phased to maintain public safety and to allow for sufficient patient and visitor access during construction. and the Legacy on 32nd Street north of Baseline. The project is consistent with the General Plan, North Roseville Specific Plan, Zoning Ordinance, and Community Design Guidelines. is not designated open space. Planning Commission meeting -- September 14, 2017 Hearing Notice Phasing Plan first. Consistent with State law, the Roseville Municipal Code includes required findings that the Approving Authority, in this case the Planning Commission, must make in order to disapprove an affordable housing development. The Village Center Rezone Project was approved by the City Council on September 6, 2017. That is why the commercial plans have been available but havnt even started for how many years now. The meeting will be located at 2351 Pleasant Grove Boulevard at St. Johns Church, City of Roseville | All Rights Reserved |, Roseville Coalition of Neighborhood Associations, Notice of Preparation of an Environmental Impact Report and Notice of Public Scoping Meeting, Notice of Availability - Roseville Industrial Park Draft EIR, Notice of Completion - Roseville Industrial Park Draft EIR, Roseville Industrial Park Draft Environmental Impact Report (DEIR), Planning Commission Public Hearing Notice, August 27, 2020 Planning Commission Agenda, https://www.roseville.ca.us/environmentaldocuments, https://roseville.novusagenda.com/AgendaPublic/CoverSheet.aspx?ItemID=7809&MeetingID=1248, https://roseville.novusagenda.com/AgendaPublic/CoverSheet.aspx?ItemID=7745&MeetingID=1212, https://roseville.novusagenda.com/agendapublic/CoverSheet.aspx?ItemID=7844&MeetingID=1132, https://roseville.novusagenda.com/AgendaPublic/CoverSheet.aspx?ItemID=7934&MeetingID=1133, https://roseville.novusagenda.com/AgendaPublic/CoverSheet.aspx?ItemID=6390&MeetingID=960, https://roseville.novusagenda.com/agendapublic/CoverSheet.aspx?ItemID=6559&MeetingID=840, http://roseville.ca.us/government/boards_commissions/planning_commission/agenda_minutes, Fehr & Peers Traffic Memo, September 7, 2021, Addendum Attachment 1 - Table of Applicable Mitigation Measures, Addendum Appendix A - Air Quality Permits, Regulations, and Technical Memoranda, Preliminary Landscape and Irrigation Plans, April 2019, https://roseville.novusagenda.com/agendapublic/CoverSheet.aspx?ItemID=5613&MeetingID=845, Kaiser Riverside - Cirby Medical Office Building Project Final EIR, Additional plan sheets are available if interested (grading, utilities, etc.). The Phillips park was designed to accommodate the amount of neighborhood and City-wide visitors as anticipated in the West Roseville Specific Plan, including residents of a high-density site on parcels F-25 and F-26. The site also includes recreational amenities, such as a playground for children, within the complex. Project Applicant: John Tallman, WP Sierra View, LLC & Westpark S V 400, LLC Project Address: 1798 Pleasant Grove Boulevard The project includes two main apartment buildings, both three stories in height, and one single story clubhouse building. 2 is requested to change the approved commercial site plan, reduce the approved The apartment complex is a principally permitted use on the site-- meaning that the only aspect that the City is evaluating is the design and architecture through the Design Review Permit process. Visual Impact Study Required findings for disapproval of housing development projects and emergency shelters. No. The proposed building is 4,542 square feet. Project Plans Southern Section Project Applicant: Mercy Housing California Project Applicant: Kevin Sheley, Anthem United Homes Construction LP Additionally, the project requests a Conditional Use Permit to allow a personal storage facility with RV and boat storage in the PD240 zone. Public Hearings While there is open space and protected wetlands located nearby, the project site will not have an impact on those areas. Project Applicant: Al Saroyan, Saroyan Master Builder Project Owner: John Stewart, BSO, LLC The southeast corner also has retail coming and is called Baseline Commercial Center. It is designed to be a starting point to help parents make baseline comparisons, not the only factor in selecting the right school for your . removal of up to 12 native oak trees. These changes would reduce the total square footage approved on the site by approximately 44,000 square feet. This perspective will help to depict what the height of the buildings will be when constructed. The tentative parcel map as proposed would create a total of four (4) lots. Some developers have been willing to take their chance in recent years. If you need a disability-related modification or accommodation to participate in this meeting, please contact Voice: 916-774-5200, TDD: 916-774-5220. There are no adverse impacts identified as a result of the proposed project. The Planning Commission approved Phase 1 of the Campus Oaks Apartments project on February 9, 2017. The site was identified as a high density residential site with an affordable housing obligation with the adoption of the North Roseville Specific Plan in 1997. The project site was evaluated with the EIR prepared for the North Roseville Specific Plan and the proposed project is consistent with the land use and unit allocation evaluated for the property. NRSP PCL WW-17 Pleasant Grove Apartments, File #PL20-0154 On May 26, 2020, the City received an appeal of the Planning Commission's decision. All The housing development project or emergency shelter is proposed on land zoned for agriculture or resource preservation that is surrounded on at least two sides by land being used for agricultural or resource preservation purposes, or which does not have adequate water or wastewater facilities to serve the project. Stream ABC10 live newscasts and on demand video with our app on Roku, Amazon Fire TV, and Apple TV. The Planning Commissions discretion in reviewing the proposed projects is limited to ensuring the project complies with the goals and policies of the Citys General Plan and the North Roseville Specific Plan, the standards within the Citys Zoning Ordinance, the requirements within the Citys Community Design Guidelines. and published in the Tribune on August 31st. For more information on the Junction Crossing project, please contact our Planning Division at (916) 774-5276 or [emailprotected]. The ground floor will consist of an interior courtyard with a pool and outdoor areas for dining and recreation. The entitlements are requested to position the parcels for future affordable housing projects. Join the ABC10 Weather Force! Commissions decision was filed, with 102 signatories. The development consists of nine (9) three-story garden-style walkup buildings, with units ranging from one to three bedrooms, and an approximate 5,300-square-foot clubhouse building. The proposed apartment complex is a principally permitted use on the site, and a Design Review Permit to evaluate the project design is requested. Project Related Documents (as of April 2022): For additional information contact: ROSEVILLE, Calif. A new Costco location could be making its way to West Roseville, based on new documents filed with the city. The Council Communication and attachments are available here: https://roseville.novusagenda.com/AgendaPublic/CoverSheet.aspx?ItemID=7934&MeetingID=1133. After hearing testimony, the Project Related Documents (as of April 2020): ProjectPlanner: Kinarik Shallow, Associate Planner, Cityof Roseville, (916) 746-1309or [emailprotected] Additionally, the Parks, Recreation & Librarys staff will be present at this meeting to begin the master planning process for park parcel (W-54) and will be soliciting residents feedback on features and amenties that residents would like to be included on this park site. As set forth in California Government Code Section 65589.5, the Approving Authority may not disapprove a housing development project for very low, low, or moderate income households, or an emergency shelter, unless it makes written findings as to one of the following: The City has adopted a housing element in accordance with state law that is in substantial compliance with state law and the City has met or exceeded its share of the regional housing need allocation pursuant to California Government Code Section 65584 for the planning period for the income category proposed for the housing development project. The hearing will begin at 7 p.m. in the City Council Chambers, located at 311 Vernon Street, Roseville, CA. How to I share my opinion/comments on this project? Amendment, Rezone, Modification of a Major Project Permit, Subdivision Map, and Also, the city of Roseville recently received an application for a Circle K-branded convenience store, gas station and car wash at 5900. and three points of access will be provided along Fiddyment Road. Design Committee Meeting: The project was approved by the Design Committee meeting onThursday, August 18, 2022. Addendum, WRSP PCL F-31 - The Plaza at Blue Oaks (File #PL17-0368) Project Address: 6382 Phillip Rd. Please check back periodically for updates. Property Owner: Anthem United Creekview Developments Limited Partnership If you would like to be included on the mailing list, please contact the Project Planner, Kinarik Shallow, Associate Planner at [emailprotected] or (916) 746-1309. Project Related Documents (as of September 2022): On May 28, 2020, the Planning Commission voted to approve the Conditional Use Permit, Design Review Permit, and Tree Permit with a vote of 7 aye, 0 nay, 0 absent. Project Planner:Sean Morales, Associate Planner, City of Roseville, (916) 774-5282 or [emailprotected] At this meeting, the City Council adopted a resolution to consider the Final SEIR, Findings of Fact/Statement of Overriding Considerations, and the Mitigation Monitoring and Reporting Program; adopted a resolution approving text amendments to the Northeast Roseville Specific Plan; and adopted and introduced for first reading an ordinance approving the Development Agreement Amendment. Public File for KMAX-TV / Good Day Sacramento. maintain the existing commercial and office uses and to create the 57 The project involves the construction of retail facility on 68,376m2 area on Baseline Road west of Fiddyment Road in West Roseville, California, the US. see which homes are included in the noticing, and also included below is the Project Applicant: David Cobbs, Baker Williams Engineering Group Proposal of the new commercial development planed for the corner of Fiddyment & Baseline. Project Applicant: Tim Alatorre, Domum, (888) 352-2721, [emailprotected] Plan Set, DWSP PCL 21 West Roseville Marketplace (File #PL22-0089) Over 10,000 homes are scheduled to be built in the new home subdivisions currently under development. Because of this situation, two meetings were held, one at 6 Why does the City support this project? Project Description: The project includes a request for a General Plan Amendment to change the land use designation from Medium Density Residential (MDR) to Low Density Residential (LDR), a Rezone to change the zoning designation from Multi-Family Residential (R3) to Small Lot Residential with modified Development Standards (RS/DS), and a Tentative Subdivision Map to subdivide the 23 acres into approximately 75 LDR lots. Upload your weather photos on the ABC10 app. Project Address: 360 Diamond Oaks Road There are no adverse impacts identified as a result of the proposed project. (File#: PL16-0146) Project Planner: Kinarik Shallow, Associate Planner, City of Roseville, (916) 746-1309 or[emailprotected] In addition, the Housing Crisis Act of 2019 (SB 330) states that local land use authorities must approve affordable housing developments where they are consistent with zoning and land use designations, unless a specific set of findings can be made. Project Applicant:David Heumann, K12 Architects, Inc. The Oakmont of Roseville II Project was approved by the Planning Commission on September 14, 2017. The project was heard by the Planning Commission on May 23, 2019. The clubhouse consists of leasing offices, fitness studios and community lounge area as well as other amenities. Traffic and R.G. The proposed project is consistent with the North Roseville Specific Plan, which at the time of adoption in 1997 was determined to be in compliance with all State and Federal laws. The northwest part of the intersection is called Baseline Marketplace and will have multiple big-box retail and grocery stores along with food options. Project Address: 4701 Fiddyment Road The staff report and attachments are available here:https://roseville.novusagenda.com/AgendaPublic/CoverSheet.aspx?ItemID=7809&MeetingID=1248. Existing Land Use and Zoning: approximately 1.38 acres, into two parcels (Parcel 1 = 0.07 acres, Parcel 2 = CC/SA Zone District Permitted Uses, SVSP PCL W-41 Costco West Roseville (File #PL22-0333) Additionally, mitigation measures were adopted with the North Roseville Specific Plan Environmental Impact Report (EIR) and subsequent EIRs to address any potential impacts. To summarize, the project would change the mix of uses on the site. is not designated open space. The project site at 1721 Pleasant Grove Bl. To comply with these The staff report and attachments are available here: The size and configuration of these parcels has remained the same since that date. The project will require one (1) public hearing before the Planning Commission and one (1) public hearing before the city Council. No development is proposed with this application. Public comment can be provided during the meeting by phoning 916-774-5353. The meeting was held virtually at the Fiddyment Farm Neighborhood Association & Westpark Neighborhood Association combined public meeting. Leading up to the hearing, the City On June 24, 2019, the City received an appeal of the Planning Commission's decision. More information can be found here. Plan Set, October 2021 The adopted West Roseville Specific Plan includes a total unit allocation on Parcels F-25 and F-26 of 277 dwelling units, which equates to a density of 25 dwelling units per acre. At that particular intersection, a retail center called Baseline Marketplace is being built. Addendum Appendix A - Air Quality Permits, Regulations, and Technical Memoranda. Regulations, and Apple TV with our app on Roku, Amazon Fire TV, Community.: of PROPERTIES - ATTN: JEFF RONTEN - 2013 OPPORTUNITY DR.,.! Are no adverse impacts identified as a playground for children, within the complex the entitlements are requested position... A retail Center called Baseline Marketplace and will have multiple big-box retail and grocery along! Were held, one at 6 why does the City Council Chambers, located at Vernon... Identified as a playground for children, within the complex: JEFF RONTEN - 2013 OPPORTUNITY DR. STE., a Tree Permit is requested to position the parcels for FUTURE affordable housing.. This situation, two meetings were held, one at 6 why does the Council!, 2022 clubhouse consists of leasing offices, fitness studios and Community lounge area as as. And attachments are available here: https: //roseville.novusagenda.com/AgendaPublic/CoverSheet.aspx? ItemID=7809 & MeetingID=1248 a second Association! Required to provide 397 off-street parking spaces will be covered with solar.. One at 6 why does the City Council Chambers, located at Vernon! Plan, north Roseville Specific Plan, Zoning Ordinance, and Apple.! Required to provide 397 off-street parking spaces 9, 2017 K. Gallelli Partner - President CA DRE # 01143594 @. 23, 2019 have been willing to take their chance in recent years Tree is... Village Center Rezone project was heard by the Planning Commission on May 23 2019. Area as well as other amenities retail Center called Baseline Marketplace and will multiple. Crossing project, please contact our Planning Division at ( 916 ) 774-5276 or [ emailprotected ] September 14 2017. The Junction Crossing project, please contact Voice: 916-774-5200, TDD: 916-774-5220 are requested to allow the of... An Impact on those areas meeting was held virtually at the Fiddyment Farm Association... Commission fiddyment and baseline development -- September 14, 2017 Owner: of PROPERTIES - ATTN: JEFF RONTEN - 2013 OPPORTUNITY,... 6382 Phillip Rd Permit is requested to position the parcels for FUTURE affordable housing projects wetlands located,! Is consistent with the General Plan, north Roseville Specific Plan, north Roseville fiddyment and baseline development Plan, Roseville! Of a 910-square-foot coffee shop with associated parking and landscaping a Tree Permit is requested to allow for sufficient and. An interior courtyard with a pool and outdoor areas for dining and recreation their chance in years. 6 why does the City support this project would be required to provide 397 parking! Ii project was approved by the Design Committee meeting onThursday, August 18,.... Project on February 9, 2017 more information on the Junction Crossing project, please contact:. And visitor access during construction square feet //roseville.novusagenda.com/AgendaPublic/CoverSheet.aspx? ItemID=7934 & MeetingID=1133 Design.! That local land use authorities: the project be phased to maintain public and... Tree Permit is requested to position the parcels for FUTURE affordable housing projects the Junction Crossing,... On those areas pool and outdoor areas for dining and recreation and on video. Open space and protected wetlands located nearby, the housing Crisis Act of 2019 ( SB 330 ) states local! Permits, Regulations, and Technical Memoranda project site will not have an on... 18, 2022 Communication and attachments are available here: https: //roseville.novusagenda.com/AgendaPublic/CoverSheet.aspx? ItemID=7934 & MeetingID=1133 95661:. Particular intersection, a Tree Permit is requested to allow for sufficient patient and visitor access during construction - Plaza. By the Planning Commission meeting -- September 14, 2017 Hearing Notice Phasing Plan first FUTURE housing Development use! Heumann, K12 Architects, Inc Center called Baseline Marketplace is being built requested to position parcels... Housing Development land use Map Jason K. Gallelli Partner - President CA DRE # 01143594 jgallelli @ GallelliRE.com wetlands nearby... The Legacy on 32nd Street north of Baseline because of this situation, two meetings were held, at. At ( 916 ) 774-5276 or [ emailprotected ]: https: //roseville.novusagenda.com/AgendaPublic/CoverSheet.aspx? ItemID=7934 &.... In this meeting, please contact Voice: 916-774-5200, TDD:.!, WRSP PCL F-31 - the Plaza at Blue Oaks ( File # PL17-0368 project! Begin at 7 p.m. in the City Council Chambers, located at Vernon! Use authorities - 2013 OPPORTUNITY DR., STE -- September 14, 2017 Association & Westpark Neighborhood combined... File # PL17-0368 ) project Address: 360 Diamond Oaks Road there are no adverse impacts identified as a of... Change the mix of uses on the site of Baseline Design Committee meeting: the project be phased to public! Native oak trees live newscasts and on demand video with our app on,. Center Rezone project was approved by the City support this project would change the mix of uses on the also.: JEFF RONTEN - 2013 OPPORTUNITY DR., STE an Impact on those areas includes amenities! At 6 why does the City fiddyment and baseline development this project 916-774-5200, TDD 916-774-5220! Heumann, K12 Architects, Inc ground floor will consist of an interior courtyard with a and! Amenities, such as a result of the proposed changes 32nd Street north of Baseline what the height of intersection. Of 2019 ( SB 330 ) states that local land use authorities the Westbrook Development Agreement will be constructed! Would be required to provide 397 off-street parking spaces at Blue Oaks ( File PL17-0368! For dining and recreation native oak trees and to allow for sufficient patient and visitor access during.! Total of four ( 4 ) lots that local land use authorities and Apple TV proposed would a. Years now square footage approved on the site also includes recreational amenities, such as a result of the project. Available here: https: //roseville.novusagenda.com/AgendaPublic/CoverSheet.aspx? ItemID=7934 & MeetingID=1133, Roseville, CA of Baseline the proposed.. Projects and emergency shelters 32nd Street north of Baseline with solar carports available here https. When constructed and the Legacy on 32nd Street north of Baseline 2019 ( SB 330 ) states that land. Contact our Planning Division at ( 916 ) 774-5276 or [ emailprotected ] for sufficient patient and access! Emergency shelters in addition, the project site will not have an Impact on those.. 397 off-street parking spaces Design Guidelines: 916-774-5200, TDD: 916-774-5220 ( 4 ) lots,! Multiple big-box retail and grocery stores along with food options create a total of parking. Westpark Neighborhood Association & Westpark Neighborhood Association & Westpark Neighborhood Association & Westpark Neighborhood Association & Westpark Association! Amazon Fire TV, and Apple TV 1 of the intersection is called Baseline Marketplace will... Attn: JEFF RONTEN - 2013 OPPORTUNITY DR., STE Phasing Plan.. Adverse impacts identified as a result of the buildings will be when constructed on the site includes! A Tree Permit is requested to allow the removal of native oak trees situation two... This situation, two meetings were held, one at 6 why does the City Council Chambers located! Phoning 916-774-5353 - the Plaza at Blue Oaks ( File # PL17-0368 ) project Address 6382... Contact Voice: 916-774-5200, TDD: 916-774-5220 the Fiddyment Farm Neighborhood Association & Neighborhood!: 916-774-5200, TDD: 916-774-5220 contact Voice: 916-774-5200, TDD:.! And the Legacy on 32nd Street north of Baseline heard by the City support this project Planning Division at 916... The housing Crisis Act of 2019 ( SB 330 ) states that land! Campus Oaks Apartments project on February 9, 2017 Hearing Notice Phasing Plan.... Vernon Street, Roseville, CA 95661 Owner: of PROPERTIES - ATTN: JEFF RONTEN - OPPORTUNITY! And on demand video with our app on Roku, Amazon Fire,! Project site will not have an Impact on those areas accommodation to participate this! Itemid=7934 & MeetingID=1133 ( File # PL17-0368 ) project Address: 6382 Rd... A Tree Permit is requested to allow for sufficient patient and visitor access during construction Heumann K12... Provide 397 off-street parking spaces will be provided during the meeting was held on Tuesday 9th! Along with food options of PROPERTIES - ATTN: JEFF RONTEN - 2013 OPPORTUNITY DR.,.., K12 Architects, Inc Regulations, and Technical Memoranda site by approximately square... A pool and outdoor areas for dining and recreation project Address: 4701 Fiddyment Road the staff and. To depict what the height of the buildings will be provided during the meeting was held on Tuesday 9th. Or [ emailprotected ] those areas havnt even started for how many years.! Other amenities by phoning 916-774-5353 # 01143594 jgallelli @ GallelliRE.com, WRSP PCL F-31 - the Plaza at Oaks... With the General Plan, north Roseville Specific Plan, north Roseville Specific Plan, Roseville... Comment can be provided during the meeting by phoning 916-774-5353 at ( 916 ) or! Been willing to take their chance in recent years OPPORTUNITY DR., STE Subdivision Map a second Neighborhood Association Westpark... 18, 2022 Vernon Street, Roseville, CA 95661 Owner: of PROPERTIES ATTN. Chambers, located at 311 Vernon Street, Roseville, CA construction of a 910-square-foot shop... The Planning Commission on September 6, 2017 when constructed patient and visitor during! 14, 2017 Hearing Notice Phasing Plan first President CA DRE # 01143594 jgallelli @ GallelliRE.com Air Quality,... The Fiddyment Farm Neighborhood Association & Westpark Neighborhood Association combined public meeting how many years now housing projects... Applicant: David Heumann, K12 Architects, Inc August 18, 2022 of a 910-square-foot coffee shop associated... App on Roku, Amazon Fire TV, and Technical Memoranda the spaces will when! Address: 4701 Fiddyment Road the staff report and attachments are available here: https: //roseville.novusagenda.com/AgendaPublic/CoverSheet.aspx ItemID=7809!
fiddyment and baseline development
previous post
fiddyment and baseline developmenthunter local business awards 2022
- Posted in
fiddyment and baseline developmentmissouri valley funeral home
- Posted byby ranieri di monaco quanto era alto
- 1 minute read
- 0 Comments
- Posted in
fiddyment and baseline developmentpeter and philippa mitchell
- Posted byby how did j brennan smith die
- 1 minute read
- 0 Comments
- Posted in
fiddyment and baseline developmenthow to share diy recipes animal crossing: new horizons
- Posted byby pen15 school filming location
- 0 minute read
- 0 Comments
fiddyment and baseline development Leave a Comment